February 12 and 14, 2008 the lab was offered to the acceptance committee for approval.
The acceptance committee was appointed by the StuurGroep of the Foundation and consisted of representatives of the Foundation, ECN and Eaton Holec. This acceptance concerned the lab as a whole, comprising design, infrastructure, functionality, safety and operation. The lab was offered for acceptance by KEMA, who designed and realised the laboratory.
The acceptance program included:
The acceptance committee accepted the lab with positive feedback for better operation